Content Summary
Customer approached MME group needing quick resolution to production delays that arose during a medical device redesign. We consolidated production of the complete assembly.
Delivered
Complete control over design enhancements, design timeline, and production schedule
Engineers designed and enhanced mold that made production possible
Supply chain consolidation
Significant cost reduction
Qualified all components in only six weeks
Complete validation throughout manufacture and final assembly
Execution of several critical design features:
Full assembly in clean room and in accordance with ISO 13485
Provided all required laser etching
Pressure test of assembled product
Completed design of compression seal
Enhanced sealing of packaging
Results
Customer received a completely assembled, packaged and sterilized product within desired leadtime at reduced cost enabling them to bring the revised product to market.
Access this content
Choose an option below
Your content has been opened.
Register to access this content
Verify your email to access this content
Code sent. Enter it in the modal
Your content has been opened.
Why do I need to verify I’m human?
Please verify you are a human before opening this content.
Your content has been opened.
The content will open in a new window. You may need to allow popups for this site.